The question that needs to be answered is: how long should the tasks in the Work Breakdown Structure (WBS) be?
Question Description
Please read the attached chapters…
The question that needs to be answered is: how long should the tasks in the WBS be?
Discuss the advantages and disadvantages of the minimum and maximum that are being presented. Think of examples where the 8/80 might not apply.
On a personal note: I do not believe that one of the numbers of the 8/80 rule is a good rule. Try to guess which number it is and what could go wrong when you use the 8/80 rule.
Double spacing makes your work easier to read.
Headings are very helpful – I should use at least 3.
Referencing to outside sources, makes your work more believable, even if a lot of it is your opinion.
Word count of 500 (plus/minus 10%) of text, without counting title page or reference page
Get your college paper done by experts
Do my question How much will it cost?Place an order in 3 easy steps. Takes less than 5 mins.
Leave a Reply
Want to join the discussion?Feel free to contribute!