Suburban Homes Construction Project Case Study Paper

Question Description

Continuing with the Suburban Homes Construction Project case study found at the end of chapter 6 (and reviewing previous chapters 1 through 5), CPM 4e, complete the following:

(20 points) Stakeholder identification and prioritization matrix (Exhibit 6-2)

(20 points) Stakeholder Matrix (Exhibit 6-4)

(20 points) Stakeholder Engagement Matrix (Exhibit 6-5)

(20 points) Communication Matrix (Exhibit 6-9)

(20 points) Mechanics

You will be assessed on content and mechanics.

Content (80 points): The content must be based on the case study materials and reading assignments. The PMBOK 6e and CPM 4e, along with other reputable resources can be used to supplement the responses through summarizing, paraphrasing and quoting those sources. Each matrix should be followed by a discussion of the matrix and how to use/interpret it.

Mechanics (20 points): The total assignment length should be at least 3 pages, not to exceed 4 pages and need to follow APA guidelines. You should review the assignment rubric in Moodle to ensure that you address all aspects of each component to this assignment.

Stakeholder ID and Priority Matrix (Exhibit 6-2)
An ID and prioritization matrix includes at least 5 relevant stakeholders and rates them for power, interest, etc.

20points

At least 5 relevant stakeholders with some minor errors in prioritization scores based on the SHCP.

17points

Less than 5 relevant stakeholders and/or some major errors in prioritization scores based on the SHCP.

14points

No submitted

0points

Stakeholder Matrix (Exhibit 6-4)

A stakeholder matrix includes at least 5 relevant stakeholders and explains their potential interests and necessary support/mitigation strategies

20points

A stakeholder matrix includes at least 5 relevant stakeholders but the explanations are not as complete as they could be.

17points

More details are clearly needed and/or less than 5 stakeholders are identified.

14points

Not submitted

0points

Stakeholder Engagement Matrix (Exhibit 6-5)

A matrix includes at least 5 relevant stakeholders with all matrix aspects fully completed and a engagement strategy that makes sense for the type of stakeholder

20points

A matrix includes at lest 5 relevant stakeholders but the positions, barriers to change or strategy are not sufficient or have minor errors

17points

More details are clearly needed and/or less than 5 stakeholders are included in the matrix.

14points

Not submitted

0points

Communication Matrix (Exhibit 6-9)

A matrix including at least 5 relevant stakeholders with communication needs and other information relevant to the type of stakeholder and previous assessment.

20points

A matrix including at least 5 relevant stakeholders with some errors or omissions in the matrix making it less useful as a tool.

17points

More details are clearly needed and/or less than 5 stakeholders are identified.

14points

Not submitted

0points

Mechanics

Materials submitted fully comply with mechanics requirements in assignment

20points

Materials submitted do not fully comply due to some minor errors

17points

Materials submitted do not resemble the mechanics requirements, but some effort was made.

10points

Not submitted

0points

Get your college paper done by experts

Do my question How much will it cost?

Place an order in 3 easy steps. Takes less than 5 mins.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *