Suburban Homes Construction Project Case Study Paper
Question Description
Continuing with the Suburban Homes Construction Project case study found at the end of chapter 6 (and reviewing previous chapters 1 through 5), CPM 4e, complete the following:
(20 points) Stakeholder identification and prioritization matrix (Exhibit 6-2)
(20 points) Stakeholder Matrix (Exhibit 6-4)
(20 points) Stakeholder Engagement Matrix (Exhibit 6-5)
(20 points) Communication Matrix (Exhibit 6-9)
(20 points) Mechanics
You will be assessed on content and mechanics.
Content (80 points): The content must be based on the case study materials and reading assignments. The PMBOK 6e and CPM 4e, along with other reputable resources can be used to supplement the responses through summarizing, paraphrasing and quoting those sources. Each matrix should be followed by a discussion of the matrix and how to use/interpret it.
Mechanics (20 points): The total assignment length should be at least 3 pages, not to exceed 4 pages and need to follow APA guidelines. You should review the assignment rubric in Moodle to ensure that you address all aspects of each component to this assignment.
Stakeholder ID and Priority Matrix (Exhibit 6-2) |
|
||||
Stakeholder Matrix (Exhibit 6-4) |
|
||||
Stakeholder Engagement Matrix (Exhibit 6-5) |
|
||||
Communication Matrix (Exhibit 6-9) |
|
||||
Mechanics |
|
Get your college paper done by experts
Do my question How much will it cost?Place an order in 3 easy steps. Takes less than 5 mins.
Leave a Reply
Want to join the discussion?Feel free to contribute!