Engineering Question

Question

Assignment Content

Complete the assignment by clicking on the question link below and then click Begin to receive your data. Read the instructions for the assignment carefully as you will be using both Excel and Word.
Use the data assigned and create the control charts with Excel and paste into the Word document provided. Answer the questions on process capability and percent out of specification. Show all calculations. The general grading criteria will be used for this assignment. 

Question 1

Control Chart 1: Complete the assignment using Excel. You will be generating a control chart and calculating process capability. To complete the exercise, use what you have learned about Excel from the previous sessions.Create control charts:

Open your assigned Excel file that has the raw data. Use this data to complete the assignment. Control Chart Data Set 1.xlsx

  1. Download and use the template X-bar&R template.xlsx 

To create the variables-type chart (X-Bar and R) chart:

Copy and paste your data from the into the template. To change the data from columns to rows, click PASTE SPECIAL after the COPY command. A dialog box will appear. Click TRANSPOSE and OK. The data will reorganize from rows to columns or vice versa.

Revise the formulas as needed for the sample size and subgroup size being analyzed. Using INSERT, create the Averages Chart (X-Bar) and the Range Chart (R). Revise titles and axis informations as needed. Copy and Paste both charts into the Word document: Control Charts and Process Capability Assignment(1).docx

Get your college paper done by experts

Do my question How much will it cost?

Place an order in 3 easy steps. Takes less than 5 mins.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *