Watch YouTube video Deming at Pontiac. Research W. Edward Deming and the total Quality movement (TQM) Read below Case study 5-2 Boeing 787 Dreamliner. Respond to the questions. Also consider how Deming and TQM would have dealt with (or avoided) problems at Boeing. What does a TQM initiative look like in an IT department? How would IT support Total Quality at Boeing?
CASE STUDY 5-2 Boeing 787 Dreamliner
The first Boeing 787 Dreamliner was delivered to Japan’s ANA in the third quarter of 2011, more than three years after the
initial planned delivery date. Its complicated, unique design (including a one-piece fuselage that eliminated the need for
1,500 aluminum sheets and 50,000 fasteners and reduced the resulting weight of the plane proportionally) promised both
a reduction in out-of-service maintenance time and a 20% increase in fuel economy, but problems with early testing of
the new design contributed to the giant project’s troubles. Even after those delays, the 787 was grounded in January 2013
because the main battery had problems of overheating and subsequently burning. The problems were finally reported solved
in December 2014.
Delivery of Boeing’s 787 Dreamliner project was delayed, in part, because of the company’s global supply chain network,
which was touted to reduce cost and development time. In reality, the network turned out to be a major cause for
problems. Boeing decided to change the rules of the way large passenger aircraft were developed through its Dreamliner
program; rather than simply relying on technological know-how, it decided to use collaboration as a competitive tool embedded
in a new global supply chain process.
With the Dreamliner project, Boeing not only attempted to create a new aircraft through the innovative design and
new material but also radically changed the production process. It built an incredibly complex supply chain involving
over 50 partners scattered in 103 locations all over the world. The goal was to reduce both the financial risks involved in a
$10 billion-plus project for designing and developing a new aircraft and the new product development cycle time. Boeing
tapped the expertise of various firms in different areas such as composite materials, aerodynamics, and IT infrastructure to
create a network in which partners’ skills complement each other. This changed the basis of competition to skill set rather
than the traditional basis of low cost. In addition, this was the first time Boeing had outsourced the production on the two
most critical parts of the plane-the wings and the fuselage.
The first sign of problems showed up just six months into the trial production. Engineers discovered unexpected bubbles
in the skin of the fuselage during baking of the composite material. This delayed the project a month. Boeing officials insisted
that they could make up the time and all things were under control. But next to fail was the test version of the nose
section. This time, a problem was found in the software programs, which were designed by various manufacturers. They
failed to communicate with each other, leading to a breakdown in the integrated supply chain. Then problems popped up in
the integration of electronics. The Dreamliner program entered the danger zone when Boeing declared that it was having
– trouble getting enough permanent titanium fasteners to hold together various parts of the aircraft. The global supply network
did not integrate well for Boeing and left it highly dependent on a few suppliers.
The battery problems involved lithium-ion batteries that could not recover from a situation involving a rare but serious
internal short circuit that would cause flames to spread from one cell to another. Lithium-ion batteries had not previously
been used in an airplane and had not been tested under an assumption of a short circuit.
This case clearly underscores the hazards in relying on an extensive supply chain, failing to expect the worst case with
critical new parts, and encountering information exchange problems that caused long delays and seriously compromised a
company’s ability to carry out business as planned. Creating a radically different process can mean encountering unexpected
problems. In some cases, it would put a company so far behind its competition that it was doomed to fail. However, in this
case, the major competitor to the Dreamliner, the Airbus 380 program, was also using a global supply chain model, and its
program was delayed by a couple of years. The result for Boeing was a much-anticipated plane with fuel economy and outstanding
design that made the wait worth it. However, because of compromises in design, the Dreamliner holds only up to
250 passengers, compared to the A380, which has a seating capacity
Get your college paper done by experts
Do my question How much will it cost?Place an order in 3 easy steps. Takes less than 5 mins.
Leave a Reply
Want to join the discussion?Feel free to contribute!